Once risks have been identified and assessed, the next question is what to do about them. Risk management standards such as ISO 31000 call this risk treatment. The options fall into four broad strategies: avoid the risk, reduce it, transfer it to someone else, or accept it. Most significant risks are managed with a combination, chosen so that the remaining risk is within the organisation’s appetite at a sensible cost.
What you will learn
- Describe the four risk treatment strategies with examples
- Choose between treatments using cost and benefit
- Understand how hedging and insurance transfer risk
- Recognise residual and secondary risks created by treatment
The four strategies
| Strategy | Meaning | Examples |
|---|---|---|
| Avoid | Stop or do not start the activity that creates the risk | Exit a high-risk market; decline a project; not lend to an unsuitable borrower |
| Reduce (mitigate) | Lower the likelihood or impact | Controls, training, diversification, backups, collateral, safety equipment |
| Transfer (share) | Pass the financial consequences to another party | Insurance, hedging with derivatives, outsourcing with contractual protections, guarantees |
| Accept (retain) | Take the risk knowingly, often with a reserve | Small, frequent losses; risks cheaper to bear than to treat; core business risks |
The choice depends on the risk’s significance, the cost of treatment and the organisation’s risk appetite. Some risks — the core risks a business exists to take, such as credit risk for a bank — are accepted deliberately and managed within limits rather than avoided.
Reducing risk: controls
Controls can be:
- Preventive — stop an event happening (access controls, approval limits, segregation of duties).
- Detective — identify it quickly (reconciliations, monitoring, audits).
- Corrective — limit the damage and recover (backups, business continuity plans, insurance claims).
Other reduction tools include diversification, which lowers exposure to any single source of loss — see diversification and asset allocation — and limits on exposures to counterparties, sectors or markets.
Transferring risk: insurance
Insurance converts an uncertain large loss into a certain premium. It suits low-likelihood, high-impact risks such as fire, major liability or the death of a key person — see insurance basics. Small, frequent losses are usually better retained, because premiums must cover the insurer’s costs and profit as well as expected claims.
Transferring risk: hedging
Hedging uses financial contracts to offset price movements. Common tools are forwards, futures, options and swaps — see derivatives and swaps.
Worked example: hedging a currency payable
An importer must pay USD 100,000 to a supplier in three months. The bank offers a three-month forward rate of 121.50 per US dollar (illustrative figures).
| Exchange rate in three months | Cost unhedged | Cost with forward |
|---|---|---|
| 118.00 (local currency strengthens) | 11,800,000 | 12,150,000 |
| 126.00 (local currency weakens) | 12,600,000 | 12,150,000 |
The forward fixes the cost at 12,150,000 whatever happens. If the currency weakens to 126, the hedge saves 450,000; if it strengthens to 118, the importer gives up a 350,000 saving. Hedging removes uncertainty — it is not a way to make profits. Options can protect against adverse moves while keeping some upside, at the cost of a premium. See foreign exchange market and market risk.
Choosing cost-effectively
A treatment is worthwhile when the reduction in expected loss — plus the value of reducing the chance of a severe loss — exceeds its cost.
Worked example: comparing treatments
A firm faces a 20% annual chance of a production outage costing 5,000,000 — an expected loss of 1,000,000 a year. A maintenance programme costing 300,000 a year would cut the probability to 5%, leaving an expected loss of 250,000 (illustrative figures).
Net benefit = 1,000,000 − 250,000 − 300,000 = 450,000 a year. The programme is justified. The remaining 5% chance could then be insured or accepted, depending on whether a 5,000,000 loss would threaten the firm.
Expected-loss comparisons should be combined with judgement about severe outcomes: a treatment can be worthwhile even when it does not pay on average if it protects the organisation from a loss it could not survive — see stress testing.
Residual and secondary risks
- Residual risk remains after treatment and must be within appetite and monitored.
- Secondary risks are new risks created by the treatment: a hedge introduces counterparty and liquidity risk; outsourcing introduces third-party risk; insurance creates the risk that a claim is disputed.
- Basis risk arises when the hedge does not perfectly match the exposure.
Personal risk mitigation
The same four strategies apply to households: avoid (not taking on unaffordable debt), reduce (an emergency fund, diversified investments), transfer (insurance) and accept (small, manageable risks).
Common mistakes
- Treating every risk the same way instead of matching the treatment to the risk.
- Insuring small, frequent losses at high cost while leaving catastrophic risks uncovered.
- Hedging speculatively or without understanding the contract.
- Ignoring the secondary risks of a treatment.
- Assuming a control works without testing it.
Key terms
- Risk treatment — action taken to modify a risk.
- Risk transfer — shifting the financial consequences of a risk to another party.
- Hedging — using financial contracts to offset price risk.
- Control — a measure that maintains or modifies risk.
- Basis risk — the risk that a hedge does not move exactly with the exposure.
Frequently asked questions
Can all risks be insured?
No. Insurers avoid risks that are uncertain to measure, too correlated or within the insured’s control. Business risks such as losing customers are generally uninsurable.
Is accepting a risk the same as ignoring it?
No. Acceptance is a deliberate decision, usually with monitoring, limits and sometimes a financial reserve.
Should every currency exposure be hedged?
Not necessarily. Firms decide based on the size of the exposure, the cost of hedging and their risk appetite; some hedge a fixed share.
Key takeaways
- The four treatments are avoid, reduce, transfer and accept — often combined.
- Controls can prevent, detect or correct; insurance and hedging transfer financial consequences.
- Choose treatments by comparing cost with the reduction in expected and severe losses.
- Every treatment leaves residual risk and may create secondary risks that need monitoring.